How long does it take to build a custom home?

Joe Stuart
Portrait of Joe Stuart, founder of Warehome.
Drawing experience from the design and engineering industries, Joe has always been interested and excited by good architecture.
26 May
4
min read
Related articles
How long does it take to build a custom home?
The time it takes to build a custom home can vary widely depending on several factors, including the size and complexity of the home, the building location, the efficiency of the construction team, weather conditions and the permitting and inspection process. However, a general timeline can provide a rough estimate of what to expect during the construction process.

General Timeline for Building a Custom Home

Pre-construction Phase: 1-2 months

  • This phase includes finalising the design with your architect, obtaining necessary permits and preparing the site for construction. The duration can vary based on local regulations and the complexity of obtaining permits.

Foundation: 2-4 weeks

  • Laying the foundation is relatively quick but depends on the type of foundation and the soil conditions. Weather can also play a significant role in this phase.

Framing: 4-6 weeks

  • Framing the house and getting it to a "dried-in" state, where the roof is on and the house is weatherproof, can take about a month or more.

Exterior Work: 1-2 months

  • This includes installing the roof, windows and exterior doors, as well as cladding/external finishes. This phase can overlap with others and depends on the materials used and weather conditions.

Interior Work: 3-5 months

  • Interior work includes electrical, plumbing, HVAC, insulation, drywall, interior finishes such as trim and painting and installing fixtures. This phase is the most variable, as it involves a lot of detailed work and coordination between various trades.

Final Touches: 1-2 months

  • The last phase involves finishing the flooring, countertops, cabinets, painting touch-ups and exterior landscaping. It also includes final inspections and obtaining a certificate of occupancy.

Total Timeframe: Approximately 10-16 months

It's important to note that these timeframes are estimates and can vary significantly based on the project's specifics. Custom homes, especially those with unique designs or high-end finishes, can take longer. Additionally, unforeseen delays such as changes to the design, material shortages or challenges with the construction site can extend the timeline.

Tips for Staying on Schedule

  • Thorough Planning: Spend adequate time in the planning and design phases to minimise changes and delays during construction.
  • Choose the Right Builder: Select a builder with experience in custom homes and a reputation for completing projects on time.
  • Regular Communication: Maintain open and regular communication with your builder and architect to address any issues promptly.
  • Contingency Planning: Have a contingency budget and timeline to accommodate unexpected delays or costs.

Building a custom home is a complex process that requires patience and flexibility. Understanding the general timeline and preparing for potential delays can help manage expectations and contribute to a smoother construction process.

Haven't found what you're looking for?
We understand how complicated the self-build is, so we're working hard on gathering the latest information for you.

But if you feel like there's an area we haven't covered, please reach out today! 
Write to us today
Further information available here: